
Below is information that can be included if you wish to detail previous events:
2019 NASTT Northeast Trenchless Conference
November 11-12, 2019
Embassy Suites by Hilton Syracuse Destiny USA
311 Hiawatha Blvd W, Syracuse, NY
Presentations for download:
- Microtunneling Under the Buffalo River
- Trenchless Pipe Slitting for Gas Line Replacement
- Choosing the Right Stormwater Pipe Rehabilitation Method: One Size Does Not Fit All
- Reinforced CIPP for Pressure Pipe Rehabilitation
- Asset Management for Buried Infrastructure
- Handling Legal Risk: Tips for Avoiding Legal Disputes on Trenchless Projects
- Work Activity Matrix for Microtunnel Inspection and Risk Management
- Low Impact Repair Solutions to a High-Impact Sewer Problem
- A Summary Of The Diverse Manhole Rehabilitation Specifications And Products That Exist In The Market Place
- Bypass Pumping 101
- Pipe Lining’s Hidden Secrets: Why The Industry Doesn’t Want You To See Inside Your Lined Pipes
2018 NASTT Northeast Trenchless Conference
November 13, 2018 (All day)
Mystic Marriott Hotel & SPA
Presentations for download:
- Great Hill Tunnel and Pipeline Restoration
- How You Spray May Delay the Day
- The South Hartford Conveyance and Storage Tunnel
- Soil and Bedrock Abrasivity Assessment for HDD
- Westport’s Pump Station No. 2 Force Main Replacement Project Using HDD: A Case Study
- Narragansett Bay Commission Rehabilitation of Large Diameter Brick Sewer with Geospray Geopolymer Mortar
- Construction of 5,500 LF of 30 & 48-inch Relief sewer using trenchless and conventional technologies
- Strategic Slip Line Rehabilitation of New York City’s Trunk Water Main System
- Pilot tube & Pipe ramming method install large diameter casing under RR
- Implementing Action Items Developed from Evaluating 200,000 Linear Feet of Large-Diameter Sewer Multi-Sensor Inspections In The City Of Hartford
- Proper Planning & Analysis Results in a Focused, Cost Effective Pipeline Rehab Project
- Structural Health Monitoring of Underground Infrastructure